Language
Email
Products
In April 2023, the roll-on-roll-off ship-ferry yard repair and docking works were carried out
In December 2022, the 100,000-ton bulk cargo yard repair and docking repair works were carried out
In July 2022, the offshore oil production platform factory repair and dock repair project were carried out
In November 2021, Offshore Petroleum Engineering (Qingdao) Co., Ltd. repaired the dry dock gate
共35条